Project summary
This project was one of the top three finalists at the Scottish Roofing Awards 2025 in the Bituminous Hot Applied Liquid Waterproofing (Scotland) category.
Blochairn Fruit Market is a major operational hub for Scotland and Northern England, and the Admin Block roof sits directly above a live CCTV monitoring facility. Our client needed a roof renewal delivered with zero tolerance for leaks, minimal disruption, and long-term confidence in the waterproofing solution.
Sennit Construction managed a heavy strip-out and installed a manufacturer-supported flat roofing system designed for durability and performance.

Proud Finalist at the NFRC Scottish Roofing Awards
Project facts
- Client: City Building Glasgow (CBG)
- Location: Glasgow
- Project value: Under £250,000
- Building type: Operational admin building (live CCTV hub below)
- Services delivered: Felt roofing / flat roof refurbishment, thermal upgrade, detailing & waterproofing
- System: Bauder Total Roof System (BTRS) with warranty-backed components
The brief
City Building Glasgow commissioned a full flat roof refurbishment to replace a failing roof build-up and improve long-term performance.
The non-negotiable requirement: the building remained watertight at all times, with no risk to the live CCTV monitoring hub beneath.

The challenge
This wasn’t a simple overlay project. This building houses the CCTV hub that monitors Scotland’s busiest food market, so keeping the roof watertight 24/7 was critical during the works.
The existing roof build-up included:
- 3,000+ concrete slabs
- loose laid insulation
- an ageing waterproofing layer
Removing that safely and efficiently was a project in itself. Add a critical facility to the mix and there’s no margin for “we’ll patch it later”, every shift had to finish secure and watertight.
Most roof refurbishments are about stopping leaks. This project was about protecting the administration hub that supports one of Scotland and North England’s busiest fruit markets. Maintaining full weatherproof integrity (where rain is relentless) was essential to ensure uninterrupted day-to-day operations.
The result? Long-term assurance for our client and a roof system engineered for decades of performance, not just the next winter.
Our solution:
We approached this like a logistics problem as much as a roofing job
Safe, efficient strip-out
To remove the slabs without turning the project into a manual-handling risk or a programme killer, we introduced specialist workhorse trolleys and controlled movements to skips.
Sequenced delivery
Works were phased roof-by-roof, allowing scaffold and access to be managed in stages and keeping exposure time to an absolute minimum.
Manufacturer-supported system install
A complete Bauder build-up was installed to spec (primer, vapour control, insulation, underlay, cap sheet), with technical support ensuring warranty compliance and consistent detailing at outlets, perimeters and junctions.
The result
Critical operations protected: Watertight integrity maintained throughout
- Delivered within agreed programme and budget
- Long-life roof system installed with manufacturer-backed support
- Improved thermal performance through upgraded insulation
- A tidy, robust finish that reflects pride in workmanship


Why the Blochairn Market refurb matters
Most roof refurbishments are about stopping leaks. This one was about protecting live operations that feed the UK. The end result is peace of mind for the client and a roof built for decades, not just the next winter.